www.nodalninja.com since 2004

Tutorials

1

Close

Power ON and Test – MECHA Dual Axis Combo

A video on how to power ON and test MECHA Dual Axis Combo - DAC.
1) Power ON MECHA Dual Axis Combo by pressing and holding the power button for 3 seconds, for each unit.
2) Wait 45 seconds, enough for the entire starting sequence to be performed. 
3) Press the following buttons
[1] [3] [1] [2] [►]
on lower MECHA, for a test panorama, then wait for the movement to stop.
4) You can use [1] [3] [1] [2] [►]
to shoot a panorama made of 3 rows, 12 shots on each row.

Power OFF MECHA Dual Axis Combo by pressing and holding the power button for 3 seconds, for each unit.



© 2013-2024 Fanotec® - Nodal Ninja® | All rights reserved. | Manufactured by Fanotec® in Hong Kong.

Cookies.

By using this website, you automatically accept that we use cookies. What for?

Understood