Installation Instruction for Dual Axis Mecha C2-E1 With NN3 MK2 (F9920) First Batch
This video is for the first batch of F9920, in new batch a different battery holder is used. It comes assembled as upper and lower assemblies in a padded case.
This video is for building from parts or breaking down the unit for other configuration or applications.