Installation Instruction for Dual Axis MECHA C2-E1 With NN3 MK3 (F9921) First Batch
This video is for the first batch of F9921, in current batch a different battery holder is used. It comes assembled as upper and lower assemblies in a padded case. This video is for building from parts or breaking down the unit for other configuration or applications.